<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Warwick Intermodal Bike and Pedestrian Access</title>
	<atom:link href="http://www.gcpvd.org/2010/03/08/warwick-intermodal-bike-and-pedestrian-access/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.gcpvd.org/2010/03/08/warwick-intermodal-bike-and-pedestrian-access/</link>
	<description></description>
	<lastBuildDate>Wed, 08 Sep 2010 03:42:10 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.0.1</generator>
	<item>
		<title>By: P Boyce</title>
		<link>http://www.gcpvd.org/2010/03/08/warwick-intermodal-bike-and-pedestrian-access/comment-page-1/#comment-145510</link>
		<dc:creator>P Boyce</dc:creator>
		<pubDate>Tue, 09 Mar 2010 23:29:17 +0000</pubDate>
		<guid isPermaLink="false">http://www.gcpvd.org/?p=6861#comment-145510</guid>
		<description>There is the study for the for the Pawtuxet River Walkway, Pare Engineering did it in 2007.
Here is a link from the RIDOT webpage:
http://www.dot.ri.gov/documents/bikeri/studies/Final_Pawtuxet_Report.pdf
It would connect to the Washington Secondary with a bridge/Tunnel over Route 2, connecting the malls under 295, and ends by Ski Market. There is also an map of future connection following Metro Center and Kilvert St to End at the inter-modal Station.</description>
		<content:encoded><![CDATA[<p>There is the study for the for the Pawtuxet River Walkway, Pare Engineering did it in 2007.<br />
Here is a link from the RIDOT webpage:<br />
<a href="http://www.dot.ri.gov/documents/bikeri/studies/Final_Pawtuxet_Report.pdf" rel="nofollow">http://www.dot.ri.gov/documents/bikeri/studies/Final_Pawtuxet_Report.pdf</a><br />
It would connect to the Washington Secondary with a bridge/Tunnel over Route 2, connecting the malls under 295, and ends by Ski Market. There is also an map of future connection following Metro Center and Kilvert St to End at the inter-modal Station.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Matthew Coolidge</title>
		<link>http://www.gcpvd.org/2010/03/08/warwick-intermodal-bike-and-pedestrian-access/comment-page-1/#comment-145478</link>
		<dc:creator>Matthew Coolidge</dc:creator>
		<pubDate>Tue, 09 Mar 2010 18:49:37 +0000</pubDate>
		<guid isPermaLink="false">http://www.gcpvd.org/?p=6861#comment-145478</guid>
		<description>Any idea what route this would take to connect?</description>
		<content:encoded><![CDATA[<p>Any idea what route this would take to connect?</p>
]]></content:encoded>
	</item>
</channel>
</rss>
