Categories

Tag Archives | Lower South Providence

City Walk Community Meeting – November 28, 2017

From the City of Providence Department of Planning and Development:


Please join the City of Providence Department of Planning and Development for the first community meeting and visioning session for the City Walk Project.

Tuesday, November 28, 2017 | 6:00PM – 8:00PM
Southside Cultural Center, 393 Broad Street
Facebook Event Page

LEARN about the project
SHARE your vision & ideas
DISCOVER ways to stay involved
INFLUENCE the final project

The project will:

  • improve safety for people driving, walking, biking, and taking transit;
  • connect residents from nine Providence neighborhoods to each other and Downtown; and
  • create a unique opportunity to celebrate diversity and culture.

Continue Reading →

0

Providence Bicycle & Pedestrian Advisory Commission Meeting – September 20, 2017

Providence Bicycle & Pedestrian Advisory Commission Meeting
September 20, 2017, 4:45 PM
Doorley Municipal Building, 444 Westminster Street, First Floor, Providence, RI 02903

bpac-roundAgenda

  1. Roll Call
  2. Introduction of New Commission Members (For Discussion)
  3. Approval of July 2017 Meeting Minutes (For Action)
  4. Election of Commission Chair and Vice Chair (For Action)
  5. Recommendations for improving Allens Avenue – Upper South Providence, Lower South Providence, Washington Park – Wards 10 and 11 (For Action) — The Rhode Island Department of Transportation, in coordination with the City of Providence, has conducted a Road Safety Assessment (RSA) for Allens Avenue. The final recommendations of the RSA have been submitted to the City. This review will allow the Commission to provide comment on these RSA recommendations. If advanced in the future, this project will come back to the Commission for preliminary plan review.
  6. “Elmwood Avenue Road Safety Assessment” – South Elmwood – Ward 9 (For Action) — The Rhode Island Department of Transportation, in coordination with the City of Providence, has conducted a Road Safety Assessment (RSA) for Elmwood Avenue south of Rose Avenue. The final recommendations of the RSA have been submitted to the City. This review will allow the Commission to provide comment on these RSA recommendations. If advanced in the future, this project will come back to the Commission for preliminary plan review.
  7. “Dean Street/Pleasant Valley Parkway/Oakland Street Corridor Discussion” – Federal Hill, Smith Hill, Valley, Elmhurst – Wards 12 and 13 (For Discussion) — The City seeks comments from the BPAC regarding possible bicycle and pedestrian improvements to the corridor between Atwells Avenue and Eaton Street known as Dean Street, Pleasant Valley Parkway, Raymond Street, and Oakland Ave. Such improvements would come back before the BPAC at least twice before construction.
  8. Announcements and Staff Updates (For Discussion)
  9. Adjournment
Full Disclosure: I am a member of this Commission.
0

Providence Bicycle & Pedestrian Advisory Commission Meeting – June 21, 2017

Providence Bicycle & Pedestrian Advisory Commission Meeting
June 21, 2017, 4:45 PM
Doorley Municipal Building, 444 Westminster Street, First Floor, Providence, RI 02903

Agendabpac-round

  1. Roll Call
  2. Approval of February 2017 Meeting Minutes (For Action)
  3. Approval of May 2017 Meeting Minutes (For Action)
  4. Nomination of Commission Chair (For Action)
  5. “Fountain Street Bike Lane Improvements” – Downtown – Ward 1 (For Action) — The City seeks comments from the BPAC regarding potential improvements to the separated bike lane on Fountain Street. Staff will present recommendations to address issues of connectivity, collision mitigation, and clarity about parking location. When advanced in the future, this project will come back to the BPAC for preliminary plan review.
  6. “Broad Street Pedestrian Improvements” – Upper South Providence, Elmwood, Lower South Providence – Wards 9, 10, and 11 (For Action) – The City of Providence seeks comments from the BPAC regarding proposed pedestrian improvements to Broad Street submitted by the Department of Public Works. These improvements would be funded from the State Highway Safety Improvement Program. When advanced in the future, this project will come back to the BPAC for preliminary plan review.
  7. “Service Road RSA” – Upper South Providence, Federal Hill – Wards 11 and 13 (For Action) – The City seeks comments from the BPAC regarding the draft Road Safety Assessment for the I-95 Service Road between Atwells Avenue and Point Street completed by VHB. The RSA includes an analysis of crashes that have occurred on the Service Road from 2009-2015 as well as proposed solutions to improve safety along the corridor. When advanced in the future, this project will come back to the BPAC for preliminary plan review.
  8. Announcements and Staff Updates (For Discussion)
  9. Adjournment
Full Disclosure: I am a member of this Commission.
2

Providence Bicycle and Pedestrian Advisory Commission Meeting – May 17, 2017

Providence Bicycle and Pedestrian Advisory Commission Meeting
May 17, 2017, 4:45 PM
Doorley Municipal Building, 444 Westminster Street, First Floor, Providence, RI 02903

bpac-roundAgenda

  1. Roll Call
  2. Staff announcement regarding new BPAC member appointments (For Discussion)
  3. Approval of March 2017 Meeting Minutes (For Action)
  4. Approval of April 2017 Meeting Minutes (For Action)
  5. “Downtown Transit Connector” – Downtown, Upper South Providence – Wards 1, 11, and 12 (For Action) — The City seeks comments from the BPAC regarding the conceptual level plans developed by RIPTA and the City for the Downtown Transit Connector—a planned high-frequency bus service that will operate between the Providence Amtrak/MBTA Station and the Hospital District in Upper South Providence. The plans include six proposed station locations, bus only lanes, pedestrian-realm improvements, and bike lanes along portions of the route. This will be a concept level review of the project scope. When advanced in the future, this project will come back to the BPAC for preliminary plan review.
  6. “Broad Street Road Safety Assessment (RSA)” – Upper South Providence, Elmwood, Lower South Providence, Washington Park – Wards 9, 10, and 11 (For Action) – The City of Providence seeks comments from the BPAC regarding the draft Broad Street Road Safety Assessment completed by VHB. The RSA includes an analysis of crashes that have occurred on Broad Street from 2009-2015 as well as proposed solutions to improve safety along the corridor. When advanced in the future, this project will come back to the BPAC for preliminary plan review.
  7. Announcements and Staff Updates (For Discussion)
  8. Adjournment
Full disclosure, I am a member of this Commission.
0

City Plan Commission Meeting – April 25, 2017

Providence City Plan Commission Notice of Regular Meeting
Tuesday, April 25, 2017, 4:45 PM
Joseph Doorley Municipal Building, 1st Floor Meeting Room 444 Westminster Street, Providence, RI 02903

cpc-round

Opening Session

  • Call to Order
  • Roll Call
  • Approval of minutes from March 21, 2017 regular meeting – for action
  • Director’s Report

Major Land Development Project – Public Hearing

1. Case No. 16-064MA Meeting Street School (Preliminary Plan) – The applicant is seeking preliminary plan approval for the first and second phases of the redevelopment of Meeting Street School. The applicant is proposing to construct extensions to the east, west and central wings of the main building at 1000 Eddy Street. This phase will also include redevelopment of the Challenger Field, development of the north parking lot and landscaping improvements along Seymour Street. The applicant is seeking a waiver from submission of state approvals at the preliminary plan stage – for action (AP 47 Lots 153, 542, 543, 548, 701, 780, 782, 784, 809, 810, 814, 833 AP 54 Lots 37, 39, 41, 42, 119, 120, Lower South Providence)

City Council Referral

2. Referral 3415 – Changes to Zoning Ordinance – Changes to zoning ordinance including inclusion of regulations for unified development review, technical changes, outlining of fee schedule, changes to the lot merger provision, clarifications and map changes. Continued from the March 21 meeting – for action

Development Review Regulation – Public Hearing

3. Amendment of the City Plan Commission’s Development Review Regulations – The Commission will review the amendments to the Development review regulations which are being amended to allow for unified development review, to ensure consistency with the Zoning Ordinance and state law, to correct technical and clerical errors and adjust administrative fees – for action

Adjournment

0

Providence Bicycle and Pedestrian Advisory Commission Meeting – February 15, 2017

Providence Bicycle and Pedestrian Advisory Commission Meeting
February 15, 2017, 4:45 PM
Doorley Municipal Building, 444 Westminster Street, First Floor, Providence, RI 02903

bpac-roundAgenda

  1. Roll Call
  2. Approval of November 2016 Meeting Minutes (For Action)
  3. Approval of December 2016 Meeting Minutes (For Action)
  4. Recommendations for improving the intersection of Canal Street and Park Row– College Hill, Downtown – Ward 12 (For Action) – The Rhode Island Department of Transportation, in coordination with the City of Providence, has conducted a Road Safety Assessment (RSA) for the intersection of Canal Street and Park Row. The draft recommendations of the RSA are being presented to the Commission for initial review. This review shall serve as the Commission’s initial concept level review of the project. If advanced in the future, this project will come back to the Commission for preliminary plan review.
  5. Recommendations for improving Mount Pleasant Avenue – Mount Pleasant – Ward 5 (For Action) – The Rhode Island Department of Transportation, in coordination with the City of Providence, has conducted a Road Safety Assessment (RSA) for Mount Pleasant Avenue Smith Street and Beaufort Street. The draft recommendations of the RSA are being presented to the Commission for initial review. This review shall serve as the Commission’s initial concept level review of the project. If advanced in the future, this project will come back to the Commission for preliminary plan review.
  6. Discussion of city-owned signalized intersections relative to expanding automatic pedestrian recall program (For Discussion)
  7. Overview of upcoming Woonasquatucket Greenway Extension (Promenade/Kinsley) project by DPD staff – Valley, Smith Hill – Wards 12 and 15 (For Discussion) This item is for discussion only and is not intended to serve as the Commission’s formal review of the project. If advanced in the future, this project will come back to the Commission for concept level review and preliminary plan review.
  8. Overview of upcoming City Walk project by DPD staff – Downtown, Fox Point, West End, Upper South Providence, Lower South Providence, Elmwood, Reservoir, Washington Park, South Elmwood – Wards 1, 8, 9, 10, and 11 (For Discussion) – This item is for discussion only and is not intended to serve as the Commission’s formal review of the project. If advanced in the future, this project will come back to the Commission for concept level review and preliminary plan review.
  9. Announcements and Staff Updates (For Discussion)
  10. Adjournment
Full disclosure: I am a member of this Commission.
4

City Plan Commission Meeting – January 17, 2017

Providence City Plan Commission Notice of Regular Meeting
Tuesday, January 17, 2017, 4:45pm
Joseph Doorley Municipal Building, 1st Floor Meeting Room
444 Westminster Street, Providence, RI 02903

cpc-roundOpening Session

  • Call to Order
  • Roll Call
  • Approval of minutes from December19, 2016 regular meeting – for action
  • Director’s Report

City Council Referral

1. Referral 3409 – 12 Lenox Avenue – The petitioner is requesting to rezone 12 Lenox Ave from R-2 to C-2. The lot measures approximately 12,000 SF. Continued from December 19, 2016 – for action (AP 53 Lot 386, Blackstone)

Development Plan Review

2. EDUCATIONAL FACILITY DEVELOPMENT PLAN – MOSES BROWN SCHOOL – The applicant, Moses Brown School, is requesting a change to their campus development plan which was last approved in 2015. The applicant is proposing to construct a 19,000 SF squash court facility with 12 courts, offices, classrooms locker rooms and other ancillary spaces. The space was originally indicated for student housing – for action (AP 11 50, 119 and 120, College Hill)

Land Development Project

RENDERING OF ATWELLS AT KNIGHT BY NORTHEAST COLLABORATIVE ARCHITECTS

3. Case No. 16-051MA – 434 Atwells Avenue (Preliminary Plan) – The applicant is requesting preliminary plan approval to construct a mixed use development in the C-1 zone that will provide forty residential units, forty parking spaces and retail space on the ground floor. A height of 50 feet and five stories is proposed. The applicant is seeking a waiver from submission of state approvals and a lighting plan at the preliminary plan stage – for action (AP 28 Lot 150 – 9,993 SF, AP 33 Lot 508 – 10,353 SF, Federal Hill)

Continue Reading →

0

Providence Bicycle & Pedestrian Advisory Commission Meeting – July 20, 2016

Providence Bicycle & Pedestrian Advisory Commission Meeting
July 20, 2016 • 4:45 PM
Doorley Municipal Building
444 Westminster Street, First Floor
Providence, RI 02903

bpac-roundAgenda

  1. Roll Call
  2. Approval of June Meeting Minutes (For Action)
  3. Olney Street Restriping – College Hill, Mount Hope (For Action) – The Department of Public Works intends to restripe Olney Street from Camp to Hope streets. DPW seeks comment from the BPAC at this initial scoping phase of the project.
  4. Allens Avenue Restriping – Upper South Providence, Lower South Providence, Washington Park (For Action) – The Rhode Island Department of Transportation has developed preliminary design plans for the restriping of Allens Avenue from Blackstone Street to New York Avenue. The City of Providence DPD and DPW seek comment from the BPAC regarding RIDOT’s preliminary plans.
  5. Francis Street Mid-Block Crossing – Downtown (For Action) – The Rhode Island Department of Transportation has developed preliminary design plans for a new mid-block crossing across Francis Street to improve pedestrian safety between Providence Place Mall and Station Park. The City of Providence DPD and DPW seek comment from the BPAC regarding RIDOT’s preliminary plans.
  6. Potential Improvements to Tobey and Ridge streets – Federal Hill (For Discussion)
  7. Potential Bicycle and Pedestrian Improvements to streets surrounding the new LINK District waterfront parks and Providence River Pedestrian Bridge – Downtown, Fox Point (For Discussion)
  8. Announcements and Staff Updates (For Discussion)
  9. Adjournment
Full Disclosure: I am a member of this commission.
1

City Plan Commission Meeting – April 28, 2015

City Plan Commission Meeting
Tuesday, April 28, 2015 – 4:45pm
444 Westminster Street, First Floor

cpc-roundOpening Session

  • Call to Order
  • Roll Call
  • Approval of minutes from February 24, 2015 meeting – for action
  • Approval of minutes from March 17, 2015 meeting – for action
  • Director’s Report

Major Land Development Project – Public Hearing

1. Case No. 14-038MA – 181 Corliss Street (Preliminary Plan Approval) – The applicant is seeking preliminary plan approval to construct a four story, 124 room extended stay hotel on the former site of an abandoned Postal Service building. The lot measures approximately 2.01 acres. The applicant is seeking a waiver from the requirement that all state permits be acquired by the preliminary plan stage. Public comment will be taken. Continued from the February 24 meeting – for action (AP 74 Lot 376, Mt. Hope)

City Council Referral

2. Referral 3389—Amendment to Port Redevelopment Plan – The amendment proposes to change the boundaries of the redevelopment area by removing two properties. The amendment will be reviewed for conformance with the Comprehensive Plan – for action (Lower South Providence)

Continue Reading →

1