Categories

Tag Archives | Downtown Design Review Committee

Downtown Design Review Committee Meeting – July 14, 2014

featured-drc Downtown Design Review Committee
Monday, July 14, 2014 – 4:45pm
Department of Planning and Development, 1st Floor Conference Room 444 Westminster Street, Providence, RI 02903

Opening Session

  • Call to Order
  • Roll Call
  • Approval of Meeting Minutes of May 12, 2014 and June 9, 2014

New Business

159-weybosset

159 Weybosset Street. Image from Google Street View.

1. DRC Application No. 14.13: 159 Weybosset Street Proposal to remove an egress door on the north elevation, create a new opening on the east elevation for a new egress door, and to construct a new handicap ramp on the property.

burnside-street-view

Burnside Park. Image from Google Street View.

2. DRC Application No. 14.14 2 Kennedy Plaza (Burnside Park) Proposal to install a new pathway across the park, modify the existing fencing at new entry points, install new granite steps at the Burnside Statue, install lighting, and construct a new granite arch at the corner of Exchange Street and Exchange Terrace.

Adjournment


0

Downtown Design Review Committee Meeting – June 9, 2014

featured-drc Downtown Design Review Committee
Monday, June 9, 2014 – 4:45pm
Department of Planning and Development, 1st Floor Conference Room 444 Westminster Street, Providence, RI 02903

Opening Session

  • Call to Order
  • Roll Call
  • Approval of Meeting Minutes of May 12, 2014
  • Annual Election of Vice Chair

New Business

1. Pre-Application Review: 201 Washington Street (Majestic/Lederer Theater, now Trinity Repertory Theater) Proposal to install three (3) digital monitors on the roof of the building (northwest elevation). This item is for discussion only. No action will be taken by the DRC at this meeting.

2. DRC Application No. 14.10: 111 Mathewson Street (1930′s addition to Arnold Building) Proposal by Blake’s Tavern to create new wall openings and to install a new entrance and storefronts on the Mathewson Street elevation, and to reopen window openings and install new windows and a storefront window on the Maiden Lane elevation. Work also includes the installation of signage and an awning.

Adjournment


0

Downtown Design Review Committee Meeting – May 12, 2014

featured-drc Downtown Design Review Committee
Monday, May 12, 2014 – 4:45pm
Department of Planning and Development, 1st Floor Conference Room 444 Westminster Street, Providence, RI 02903

Opening Session

  • Call to Order
  • Roll Call
  • Approval of Meeting Minutes of April 14, 2014
  • Annual Election of Vice Chair

New Business

merchants-bank

Image from Google Street View

1. DRC Application No. 14.8: 20 Westminster Street (Merchants Bank Building) Proposal to create ten (10) new wall openings for the installation of new windows on the east façade; and to create a new opening for the installation of a new a new egress door on the Jerry Street (alley) elevation of the building.

Adjournment


0

Downtown Design Review Committee Meeting – April 14, 2014

narrow-building

The George C. Arnold (“Narrow”) Building on Washington Street.

featured-drc Downtown Design Review Committee
Monday, April 14, 2014 – 4:45pm
Department of Planning and Development, 1st Floor Conference Room 444 Westminster Street, Providence, RI 02903

Opening Session

  • Call to Order
  • Roll Call
  • Approval of Meeting Minutes of March 10,2014
  • Annual Election of Vice Chair

New Business

1. DRC Application No. 14.4: 250 Westminster Street (Alice Building) Proposal by Cornish Associates to replace the existing window system with a new window system, and to install a new awning system on the Union Street elevation of the building.

2. DRC Application No. 14.5: 100 Washington Street (Arnold Building) Proposal by David Stem to restore the entire building, including the installation of new storefronts on the Washington Street elevation.

Adjournment


Full disclosure: I work for Cornish Associates.
1

Downtown Design Review Committee meeting – March 10, 2014

featured-drc Downtown Design Review Committee
Monday, March 10, 2014 – 4:45pm
Department of Planning and Development, 1st Floor Conference Room 444 Westminster Street, Providence, RI 02903

Opening Session

  • Call to Order
  • Roll Call
  • Approval of Meeting Minutes of December 9, 2013
  • Annual Election of Vice Chair

New Business

1. DRC Application No. 14.2: 76 Westminster Street (Turks Head Building) Proposal by 76 Westminster Street, LLC to replace the existing revolving door with a new entry door system and ATM (for Bank RI) on the Westminster Street elevation of the building.

Adjournment


0

Downtown Design Review Committee Meeting – December 9, 2013

featured-drc Downtown Design Review Committee
Monday, December 9, 2013 – 4:45pm
Department of Planning and Development, 1st Floor Conference Room 444 Westminster Street, Providence, RI 02903

Opening Session

  • Call to Order
  • Roll Call
  • Approval of Meeting Minutes of September 9, 2013 and October 7, 2013
  • Acceptance of 2014 DDRC Meeting Schedule

New Business

1. DRC Application No. 13.27: 75 Weybosset Street (Atlantic Bank Building) The applicant seeks approval for the installation of a painted wall sign for ‘Noon Design Shop’ on the west elevation of the building. (Violation Response)

2. DRC Application No. 13.31: 326 Westminster Street (Kinsley Building) – Public Hearing Proposal by Cornish Associates to restore the building, which includes exterior alterations and the installation of new storefronts. The building is being converted to residential/mixed?use. The applicant is also requesting a Development Incentive, specifically a Density Bonus, for an additional residential unit.

Adjournment


0

Downtown Design Review Committee Meeting – October 7, 2013

featured-drc Downtown Design Review Committee
Monday, October 7, 2013 – 4:45pm
Department of Planning and Development, 1st Floor Conference Room 444 Westminster Street, Providence, RI 02903

Opening Session

  • Call to Order
  • Roll Call
  • Approval of Meeting Minutes of September 9, 2013

New Business

1. DRC Application No. 13.13: 270 Weybosset Street (Richmond Building) Proposal by Johnson & Wales University to alter an existing window to a door and to construct a new accessible ramp and on the west elevation (alley side) of the building.

2. DRC Application No. 13.14: 198 Union Street* (Fletcher Building) Proposal by Rhode Island School of Design to renovate a portion of the first floor and to install a new storefront system on the Union Street elevation of the building.

Adjournment


*The former location of the Providence Eagle.

0

Downtown Design Review Committee Meeting – September 9, 2013

featured-drc Downtown Design Review Committee
Monday, September 9, 2013 – 4:45pm
Department of Planning and Development, 1st Floor Conference Room 444 Westminster Street, Providence, RI 02903

Opening Session

  • Call to Order
  • Roll Call
  • Approval of Meeting Minutes of July 8, 2013 and August 5, 2013

New Business

DRC Application No. 13.16: 111 Mathewson Street (1930′s addition to Arnold Building)* Continued review of the proposal by Bookworm Assoc. LLC to modify an existing storefront window, and to create a new wall opening for the installation of a new storefront system on the front elevation of the building.

Other Business

Pre-Application Review: Esplanade at India Pont, 39 Pike Street and 40 Tockwotton Street Proposal by Churchill & Banks to construct a new 29,000-sf addition containing retail/office space at 39 Pike Street; and to construct a new building containing 52 apartments, fitness center, lounge, roof deck, and garage with 170 parking spaces at 40 Tockwotton Street. This item is for discussion only. No action will be taken by the DRC at this meeting.

Adjournment


*Confusingly, this is the Arnold Building which houses Cellar Stories Books (which confusingly is not in a cellar, but on the second floor), not the Narrow Building across the street which is also called the “Arnold Building.”

5

Downtown Design Review Committee Meeting – August 5, 2013

Notice of Regular Meeting • Monday, August 5, 2013 – 4:45pm
Department of Planning and Development, 1st Floor Conference Room 444 Westminster Street, Providence, RI 02903

Opening Session

  • Call to Order
  • Roll Call
  • Approval of Meeting Minutes of June 10, 2013 and July 8, 2013

New Business

1. DRC Application No. 13.15: 274 Weybosset Street – Del Sesto Building (formerly Summerfield Building) Proposal by Johnson and Wales University to construct a new stair tower addition at the rear of the building (south elevation).

2. DRC Application No. 13.16: 111 Mathewson Street (1930′s addition to Arnold Building*) Proposal by Bookworm Assoc. LLC to modify an existing storefront window, and to create a new wall opening for the installation of a new storefront system on the front elevation of the building.

Adjournment


*Confusingly, this is the Arnold Building which houses Cellar Stories Books (which confusingly is not in a cellar, but on the second floor), not the Narrow Building across the street which is also called the “Arnold Building.”

1

Downtown Design Review Committee Meeting – July 8, 2013

Notice of Regular Meeting • Monday, July 8, 2013 – 4:45pm
Department of Planning and Development, 1st Floor Conference Room 444 Westminster Street, Providence, RI 02903

Opening Session

  • Call to Order
  • Roll Call
  • Approval of Meeting Minutes of June 10, 2013

New Business

DRC Application No. 13.13: 44 Hospital Street – Public Hearing Proposal by 44 Hospital Street, LLC to demolish the existing structure located at 44 Hospital Street, and to construct a new six-story mixed-use building on the site. The applicant is requesting a waiver from D-1 Regulations for demolition of the existing building.

Adjournment


This project was denied a variance to minimum parking regulations by the Zoning Board of Review in part on account of neighborhood objection. The project is seeking a variance from the Zoning Board of Review to have fewer than the required minimum parking spaces; the variance is facing neighborhood opposition. The project is seeking fewer parking spaces than a development of its size is mandated to have.

3